This is an update to a previous blog post. The solar array on top of the University Office Plaza was installed in March of 2012 and is operational. The rooftop is located south of the TCF bank Stadium on the Minneapolis Campus of the University of Minnesota.
The installation is expected to reduce the building's carbon emissions by 38 million metric tons per year. It is part of the Energy Innovation Corridor along the light rail transit line between the downtown Minneapolis and downtown St. Paul.
http://www.facm.umn.edu/prod/groups/uservices/@pub/@uservices/@fm/documents/content/uservices_content_390569.jpg |
The installation is expected to reduce the building's carbon emissions by 38 million metric tons per year. It is part of the Energy Innovation Corridor along the light rail transit line between the downtown Minneapolis and downtown St. Paul.
No comments:
Post a Comment